All-rounder cable plough without cab - High laying performance for versatile ploughing work
Der FOECK Plough FSP 24 C-line
The FSP 24 FOECK laying plough is ideal for laying cables and HDPE pipes up to a diameter of 280 mm which are supplied via a drum with a maximum weight of 4.000 kg, carried by a vehicle. The laying depth can be continuously adjusted up to 2.200 mm. Thanks to individual insertion elements, several cables/pipes can be laid in a single work step with warning tapes, lightning arrestors and cover strips. If a drawn expander mandrel (Torpedo) is used, then the FSP 24 is also suitable for steel and cast iron pipes.
The C-line has been deliberately designed without a cabin/driver's seat. This is particularly suitable for use in confined spaces (next to shrubs and trees or when working on photopholtaic open-space installations). It is controlled with an advanced radio remote control.
- Variable spur width of 2.150 to 5.500 mm
- High laying capacity: up to 1,500 m per hour
- Extremely agile with the smallest plowing radius of curvature of 4 m
- Versatile due to interchangeable ripper shoe and laying element for an optimal transfer slot for each tube
- Safe thanks to automatic safety cut-off and trenchless installation
Type | FSP 24 |
Engine power | 74 hp / 55.4 kW |
Cylinders | 4 |
Emissions class | Stufe V, TIER IV final |
Wheel drive | 4 x 4 Hydrostatic |
Hydraulic steering | 4-wheel |
Front tyres | 710/45-26,5 20 PR |
Rear tyres | 600/55-26,5 20 PR |
Length | 10.700 mm |
Min. width | 2.320 mm |
Max. width | 5.950 mm |
Min. height | 3.540 mm |
Weight (standard equipment) | 17.300 kg |
Laying capacity | up to 1.500 m/h |
Laying depth, continuous up to | 2.200 mm |
Wading depth (at a laying depth of 1.5 m) | up to 1,4 m |
Ploughable turning radius | 4.000 mm |
Drum holder ø-max. Max. width Max. weight. | 2.800 mm (3.800 mm*) 1.800 mm (2.500 mm*) 4.000 kg |
Cab | without cabin |
(installation chutes/laying chutes*) | Flexible pipes up to ø 280 mm or several cables/pipes simultaneously Cable/pipe laying chutes in all sizes Low, medium and high-voltage cable up to 110 kV, in triangular configuration and over 110 kV according to specification of the energy supplier with cable monitoring and documentation (special equipment) Line warning tape is height-adjustable above cable/pipe, lightning protection lines and cover strips according to customer requirements Installation chute for steel and cast iron pipes Induction torpedo for pipes up to ø 630 mm (in drawing-in procedure) Delivery chute for the insertion of ground stabilising materials Other special equipment and laying chutes upon request |
*optional